Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to search (→To Do:) |
|||
Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Received and activated BW token |
− | * | + | * Talked to AS regarding Anderson GoF |
− | ** | + | ** Reviewed codebase, provided feedback to AS |
− | ** | + | ** Defined inputs and output data products |
− | + | * Updated Method 1 and Method 2 descriptions on OS X Guide | |
− | |||
− | |||
− | * | ||
== Today == | == Today == | ||
− | * | + | * Another update to OS X Guide |
− | ** | + | ** Merged some OS X instructions into main User Guide |
− | * | + | ** Simplified OS X method 2 description |
− | * | + | ** Added links to better direct user |
+ | * Mofidied Anderson GoF Code | ||
+ | ** Enabled plotting | ||
+ | ** Removed hard-coded paths and filenames | ||
+ | ** Sent code back to AS for continued development | ||
== Blocked: == | == Blocked: == |
Revision as of 20:22, 4 June 2015
Contents
Yesterday
- Received and activated BW token
- Talked to AS regarding Anderson GoF
- Reviewed codebase, provided feedback to AS
- Defined inputs and output data products
- Updated Method 1 and Method 2 descriptions on OS X Guide
Today
- Another update to OS X Guide
- Merged some OS X instructions into main User Guide
- Simplified OS X method 2 description
- Added links to better direct user
- Mofidied Anderson GoF Code
- Enabled plotting
- Removed hard-coded paths and filenames
- Sent code back to AS for continued development
Blocked:
- No
Followups:
- No
To Do:
Short Term
Broadband Platform
- BBP Mac OS X Instructions: 1 day
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- Update Anderson method