Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Submitted AGU abstract
+
*Ran into seg fault on BBP on BW, Fabio resolved
*Installed BBP on Blue Waters, seg faults on unit tests
+
*Gathered Study 15.4 metrics from Blue Waters logs
*Renewed OSG certificate for Titan
 
  
 
== Today ==
 
== Today ==
*Gather Study 15.4 metrics from Titan logs
+
*Pass unit and acceptance tests in BBP
*Gather Study 15.4 metrics from Blue Waters logs
+
*Create reference solution for verifying CyberShake BB implementation
*Gather Study 15.4 metrics from workflow logs
+
*Start integrating new version of BBP HF codes into
*Start population of Pegasus-statistics DB
+
*Submit SCEC abstract
 
+
*Check on population of Pegasus-statistics DB
 +
*Email Brian Thomas (earth sci educator, STL science center)
  
 
== Blocked ==
 
== Blocked ==
Line 15: Line 15:
  
 
== Follow-ups ==
 
== Follow-ups ==
*Call with Phil at 1:30
+
*HighF call
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:11, 11 August 2015

Yesterday

  • Ran into seg fault on BBP on BW, Fabio resolved
  • Gathered Study 15.4 metrics from Blue Waters logs

Today

  • Pass unit and acceptance tests in BBP
  • Create reference solution for verifying CyberShake BB implementation
  • Start integrating new version of BBP HF codes into
  • Submit SCEC abstract
  • Check on population of Pegasus-statistics DB
  • Email Brian Thomas (earth sci educator, STL science center)

Blocked

  • No

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration