Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
 
*Monitored Study 15.12
 
*Monitored Study 15.12
*Ran into issue with RVGAHP workflow and staging jobs, worked on with Gideon
+
*Installed better version of Condor on Titan
*Asked Rob about projection issues
+
*Added default cores and walltime to fix issues with Titan staging jobs
*Talked with David about velocity models
+
*Emailed velocity model proposal to group
  
 
== Today ==
 
== Today ==
 
*Monitor Study 15.12
 
*Monitor Study 15.12
*Continue work to fix staging jobs
+
*Monitor test workflow on Titan
*Email velocity model proposal to group for OK
+
*Investigate patchmodel code
*Decide on smoothing algorithm
 
  
 
== Blocked ==
 
== Blocked ==
Line 15: Line 14:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*Patrick to discuss velocity model smoothing
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 19:17, 19 January 2016

Yesterday

  • Monitored Study 15.12
  • Installed better version of Condor on Titan
  • Added default cores and walltime to fix issues with Titan staging jobs
  • Emailed velocity model proposal to group

Today

  • Monitor Study 15.12
  • Monitor test workflow on Titan
  • Investigate patchmodel code

Blocked

  • No

Follow-ups

  • Patrick to discuss velocity model smoothing

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration