*Monitored Study 15.12, 65% | *Monitored Study 15.12, 65% | ||
*Looked at server for DB test, asked John to mount SCEC disks | *Looked at server for DB test, asked John to mount SCEC disks | ||
− | *Built CyberShake codebase | + | *Built CyberShake codebase on Cori |
*Ran basic GRAM tests on Cori, passed | *Ran basic GRAM tests on Cori, passed | ||
Line 9: | Line 9: | ||
*Update Pegasus to 4.6 on shock | *Update Pegasus to 4.6 on shock | ||
*Plot velocity smoothing results, verify | *Plot velocity smoothing results, verify | ||
+ | *If smoothing looks good, generate profiles, send to group for feedback | ||
== Blocked == | == Blocked == |
Revision as of 18:14, 8 February 2016
Yesterday
- Monitored Study 15.12, 65%
- Looked at server for DB test, asked John to mount SCEC disks
- Built CyberShake codebase on Cori
- Ran basic GRAM tests on Cori, passed
Today
- Acceleration plots to Phil for SI2 poster
- Update Pegasus to 4.6 on shock
- Plot velocity smoothing results, verify
- If smoothing looks good, generate profiles, send to group for feedback
Blocked
- No
Follow-ups
- HighF at 11
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration