Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
 
*Monitored Study 15.12, 65%
 
*Monitored Study 15.12, 65%
 
*Looked at server for DB test, asked John to mount SCEC disks
 
*Looked at server for DB test, asked John to mount SCEC disks
*Built CyberShake codebase dependencies on Cori
+
*Built CyberShake codebase on Cori
 
*Ran basic GRAM tests on Cori, passed
 
*Ran basic GRAM tests on Cori, passed
  
Line 9: Line 9:
 
*Update Pegasus to 4.6 on shock
 
*Update Pegasus to 4.6 on shock
 
*Plot velocity smoothing results, verify
 
*Plot velocity smoothing results, verify
 +
*If smoothing looks good, generate profiles, send to group for feedback
  
 
== Blocked ==
 
== Blocked ==

Revision as of 18:14, 8 February 2016

Yesterday

  • Monitored Study 15.12, 65%
  • Looked at server for DB test, asked John to mount SCEC disks
  • Built CyberShake codebase on Cori
  • Ran basic GRAM tests on Cori, passed

Today

  • Acceleration plots to Phil for SI2 poster
  • Update Pegasus to 4.6 on shock
  • Plot velocity smoothing results, verify
  • If smoothing looks good, generate profiles, send to group for feedback

Blocked

  • No

Follow-ups

  • HighF at 11

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration