Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Monitored Study 15.12, some issues with Pegasus 4.6
+
*Study 15.12 registration very slow, asked ISI for assistance
*Ran Cori workflow tests, some problems with Pegasus 4.6, worked with ISI
+
*Wrote Pegasus blurb for ISI
*Generated SRFs for forward test; all the initiation times are 0, checked with Rob, that's not correct
+
*Continued with Cori workflow tests
 +
*Resolved SRF problem with Rob's help
  
 
== Today ==
 
== Today ==
*Monitor Study 15.12
+
*Create tool to query UCVM for shear modulus
*Write Pegasus blurb for ISI
+
*Create CyberShake schematic for Pegasus group
*Continue with Cori workflow tests
+
*Check with ISI to see if slow registration issue is resolved
 
*Install schema and required info on test DB for insertion test
 
*Install schema and required info on test DB for insertion test
*If Rob gets back to me, integrate changes and recreate SRFs
+
*Check on status of Cori workflow tests
  
 
== Blocked ==
 
== Blocked ==
Line 15: Line 16:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*Summer school call
 +
*HighF
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:02, 22 February 2016

Yesterday

  • Study 15.12 registration very slow, asked ISI for assistance
  • Wrote Pegasus blurb for ISI
  • Continued with Cori workflow tests
  • Resolved SRF problem with Rob's help

Today

  • Create tool to query UCVM for shear modulus
  • Create CyberShake schematic for Pegasus group
  • Check with ISI to see if slow registration issue is resolved
  • Install schema and required info on test DB for insertion test
  • Check on status of Cori workflow tests

Blocked

  • No

Follow-ups

  • Summer school call
  • HighF

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration