Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Migrated to Pegasus 4.6.1dev for shock
+
*Performance review
*Revised CyberShake schematic for ISI
+
*Verified results from shear modulus code, found and fixed bug
*Resumed Study 15.12
+
*Installed schema and required info on test DB for insertion test
*Queued up shear modulus code on Rhea
+
*Monitored Study 15.12
 +
*DirectSynth code on Cori; found int overflow
  
 
== Today ==
 
== Today ==
*Verify results from shear modulus code
 
*Install schema and required info on test DB for insertion test
 
 
*Monitor Study 15.12
 
*Monitor Study 15.12
*Check on Cori workflows
+
*Fix DirectSynth issue on Cori
 +
*Try insertion test on DB
  
 
== Blocked ==
 
== Blocked ==
Line 15: Line 15:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*CyberShake call at 11
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:06, 26 February 2016

Yesterday

  • Performance review
  • Verified results from shear modulus code, found and fixed bug
  • Installed schema and required info on test DB for insertion test
  • Monitored Study 15.12
  • DirectSynth code on Cori; found int overflow

Today

  • Monitor Study 15.12
  • Fix DirectSynth issue on Cori
  • Try insertion test on DB

Blocked

  • No

Follow-ups

  • CyberShake call at 11

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration