Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
*Resumed Study 15.12 (90 sites left)
 
*Resumed Study 15.12 (90 sites left)
 
*Resolved seismogram problems with Study 15.12 sites
 
*Resolved seismogram problems with Study 15.12 sites
*AWP source files uploaded, set up and run forward simulation
+
*AWP source files uploaded, checked with Yifeng about using GPU code for forward sim
 
*Checked into getting DOI assigned to Study 15.4 dataset - not trivial
 
*Checked into getting DOI assigned to Study 15.4 dataset - not trivial
  
Line 9: Line 9:
 
*Email Cori help about the queues
 
*Email Cori help about the queues
 
*Monitor Study 15.12
 
*Monitor Study 15.12
 +
*Configure forward sim
 
*Review Blue Waters Graduate Fellowship apps
 
*Review Blue Waters Graduate Fellowship apps
 
*Identify ruptures which match CyberShake validation criteria
 
*Identify ruptures which match CyberShake validation criteria

Revision as of 18:50, 8 March 2016

Yesterday

  • Monitor Cori test - still waiting...
  • Resumed Study 15.12 (90 sites left)
  • Resolved seismogram problems with Study 15.12 sites
  • AWP source files uploaded, checked with Yifeng about using GPU code for forward sim
  • Checked into getting DOI assigned to Study 15.4 dataset - not trivial

Today

  • Email Cori help about the queues
  • Monitor Study 15.12
  • Configure forward sim
  • Review Blue Waters Graduate Fellowship apps
  • Identify ruptures which match CyberShake validation criteria
  • Add wiki page for CyberShake 1.0, upload files

Blocked

  • No

Follow-ups

  • IHPCSS call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration