Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Monitored Study 15.12: 4 sites left
+
*Regenerated missing ruptures
*Fixed issue with Study 15.12 seismogram
+
*1 more Study 15.12 site done: 3 to go
*Created AWP GPU movie, sent out - identified issue with SRF
+
*Populated Moment DB with missing tables
*Titan SGT runs completed successfully
+
*Rob's SRF looks different; not sure why
  
 
== Today ==
 
== Today ==
*Transfer Titan SGTs to Blue Waters
+
*Continue work on Study 15.12
*Regenerate missing ruptures
+
*Investigate SRF problem with Rob
*Run Study 15.12 on 4 remaining sites
 
*If hear back from Rob or Christine, work on comparing Northridge events to historical
 
*May hear back from Rob on SRF issues: if so, implement fix, rerun fwd sim, regenerate movie
 
  
 
== Blocked ==
 
== Blocked ==
Line 16: Line 13:
  
 
== Follow-ups ==
 
== Follow-ups ==
*High-F call
+
*Summer School call
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:11, 26 April 2016

Yesterday

  • Regenerated missing ruptures
  • 1 more Study 15.12 site done: 3 to go
  • Populated Moment DB with missing tables
  • Rob's SRF looks different; not sure why

Today

  • Continue work on Study 15.12
  • Investigate SRF problem with Rob

Blocked

  • No

Follow-ups

  • Summer School call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration