Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Plotted velocity model, smoothing good
+
*Generated NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
*Queued up 1 Hz SGT run
+
*Checked on PAS run - completed, emailed out for discussion
*Got codes together for David and Billy
+
*HighF call
*Fixed issue with PAS stochastic codes on recompile - same issue we saw earlier
+
*Meeting with Phil to discuss interns on HPC resources
 +
*Intern prep meeting
  
 
== Today ==
 
== Today ==
*Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
 
*Check on PAS run
 
 
*Gather metrics from Study 15.12
 
*Gather metrics from Study 15.12
 
*Document details of stochastic sims in Study 15.12 on wiki
 
*Document details of stochastic sims in Study 15.12 on wiki
 +
*Work with SCEC-VDO-VTK to get list of required bug fixes/features for Sanskriti
  
 
== Blocked ==
 
== Blocked ==
*No
+
*Titan down for maintenance
  
 
== Follow-ups ==
 
== Follow-ups ==
*Summer school mentor meeting at 8
+
*Summer School call at 7
*Intern prep meeting at 10
 
*High-F at 11
 
*Phil re:intern HPC accounts?
 
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 15:50, 24 May 2016

Yesterday

  • Generated NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
  • Checked on PAS run - completed, emailed out for discussion
  • HighF call
  • Meeting with Phil to discuss interns on HPC resources
  • Intern prep meeting

Today

  • Gather metrics from Study 15.12
  • Document details of stochastic sims in Study 15.12 on wiki
  • Work with SCEC-VDO-VTK to get list of required bug fixes/features for Sanskriti

Blocked

  • Titan down for maintenance

Follow-ups

  • Summer School call at 7

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration