Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 7: Line 7:
 
*Resubmit seismogram synthesis, see if seg fault disappears
 
*Resubmit seismogram synthesis, see if seg fault disappears
 
*Edit IHPCSS mentoring docs
 
*Edit IHPCSS mentoring docs
 +
*Email out mentee/mentor pairs
 
*Update Study 15.12 wiki
 
*Update Study 15.12 wiki
 
*Customize SCEC-VDO navigation
 
*Customize SCEC-VDO navigation
Line 14: Line 15:
 
*Create dummy sites at box corners; determine volume size
 
*Create dummy sites at box corners; determine volume size
 
*Get CyberShake estimates for INCITE proposal: CCSP for 900 m/s and 500 m/s, 1 Hz; also So Cal with UCERF 3 tests
 
*Get CyberShake estimates for INCITE proposal: CCSP for 900 m/s and 500 m/s, 1 Hz; also So Cal with UCERF 3 tests
 +
*Work on intern tutorial
  
 
== Blocked ==
 
== Blocked ==

Revision as of 17:55, 15 June 2016

Yesterday

  • Worked on intern HPC presentation
  • Updated DB migration plan
  • Matched mentors and mentees for IHPCSS

Today

  • Resubmit seismogram synthesis, see if seg fault disappears
  • Edit IHPCSS mentoring docs
  • Email out mentee/mentor pairs
  • Update Study 15.12 wiki
  • Customize SCEC-VDO navigation
  • Run a few tests to determine what to do with old CyberShake studies to move them off production
  • Update wiki with CyberShake specification template
  • Update wiki with process for defining CyberShake box
  • Create dummy sites at box corners; determine volume size
  • Get CyberShake estimates for INCITE proposal: CCSP for 900 m/s and 500 m/s, 1 Hz; also So Cal with UCERF 3 tests
  • Work on intern tutorial

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration