Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
 
(24 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
=== Yesterday ===
 
=== Yesterday ===
* csep-op: CA 30-min reprocessing due to stuck process
+
* Fixed configuration for TX and WX evaluation of one-day-models-V16.7 vs one-day-models-V12.10 groups
* Installation of David R. new ETASSYN model:
+
* Responded to Josh G. at UCLA regarding model submission
** David provided fixes for simulated catalogs prefix and long/lat values
+
* ComCat integration within CSEP:
** Ran acceptance test, sent generated catalogs and forecast to David for approval
+
** Lynda L. at USGS responded regarding ComCat
* Model submission by Anna Maria L. for experiment with simulated catalogs
+
** Installed libcomcat, does not support Python3
** Reviewed submission, sent a list of things to fix to Anna Maria
 
  
 
=== Today ===
 
=== Today ===
* csep-op: CA 30-min reprocessing due to stuck process
+
* Max W. request for latest CSEP data and figures
* Installation of David R. new ETASSYN model:
+
* csep-op: retrospective evaluation of simulated forecasts
** Archive original ETAS_DR_M2.95 forecasts as those should not be evaluated with model's simulated catalogs
+
* ComCat integration within CSEP
** Add flag to "stage" original ETAS_DR_M2.95 forecast for future evaluation
 
** Filter simulated catalogs by testing region and generate decimal year
 
* CSEP code changes to support ETAS model with simulated catalogs by David R.
 
  
 
'''Blocked''': No
 
'''Blocked''': No

Latest revision as of 17:34, 22 August 2016

Current Activities

Yesterday

  • Fixed configuration for TX and WX evaluation of one-day-models-V16.7 vs one-day-models-V12.10 groups
  • Responded to Josh G. at UCLA regarding model submission
  • ComCat integration within CSEP:
    • Lynda L. at USGS responded regarding ComCat
    • Installed libcomcat, does not support Python3

Today

  • Max W. request for latest CSEP data and figures
  • csep-op: retrospective evaluation of simulated forecasts
  • ComCat integration within CSEP

Blocked: No

Followups: No

Responsiblities