Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
 
(75 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Finalized BBP directory structure updates
+
* Looked for obs data for NR event
* Got final OK from JC for the UCSB code and parameters
+
** Forward station list table to CG
* Testing pre-RC1 on HPCC
+
* Mtg with CG regarding BBP issues
* Got all Unit/Acceptance tests to pass
+
* Site response changes
* Coordinating with JY about epicenter drives
+
** Surveyed current site response methods on BBP
* Worked on BBP examples for First Simulations
+
** Make available to all methods
  
 
== Today ==
 
== Today ==
  
* Finish BBP testing on HPCC
+
* Finish site response changes
* Update Release Notes
+
** Maintain existing workflow
* Update Mac OS X Installation Guide
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Work on BBP User's Guide
+
* Update wiki page for multi-segment ruptures
+
** Add diagram
 +
* Review High-F package from SA
 +
 
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
 +
 
* No
 
* No
 +
 +
== To Do: ==
 +
 +
=== Short Term ===
 +
 +
==== Broadband Platform ====
 +
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 +
=== Medium Term ===
 +
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon