Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
 
(370 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
+
== Yesterday ==
* Call with Ronnie and Katie about Fling Study
 
** Ronnie will make changes to station lists, then we are good to go
 
* Reproduced Rumi's results using 11.2.3 and her scenarios
 
** Results do not look good when using URS codebase for LF
 
* Initial analysis of space and time requirements for running Fling Study
 
** Short summary: 1.7Tb and about 3 months :-(!
 
 
== Today: ==
 
  
* Organize Fling Study information on the wiki, create progress tables
+
* Looked for obs data for NR event
** Trac #95 (wiki updating)
+
** Forward station list table to CG
* Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
+
* Mtg with CG regarding BBP issues
* Meet with Phil and John Yu wrt Fling Study strategy
+
* Site response changes
* Make trunk work both with and without site response
+
** Surveyed current site response methods on BBP
 +
** Make available to all methods
  
== Ongoing: ==  
+
== Today ==
* Look for ways to break up the GF directory layout, some ideas are:
+
 
** First candidate is removing the plot directory from the GF directory
+
* Finish site response changes
** Create separate validation package
+
** Maintain existing workflow
** Separate events and codebases from each other
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
 +
* Update wiki page for multi-segment ruptures
 +
** Add diagram
 +
* Review High-F package from SA
  
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
* Meeting with John Yu and Phil @ TBD
+
 
 +
* No
 +
 
 +
== To Do: ==
 +
 
 +
=== Short Term ===
 +
 
 +
==== Broadband Platform ====
 +
 
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 
 +
=== Medium Term ===
 +
 
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon