== Yesterday: ==
+
== Yesterday ==
  
* Fling Study
+
* Looked for obs data for NR event
** Finished running Scenario 104
+
** Forward station list table to CG
** Ran Scenario 107, compared results against John's run --> OK
+
* Mtg with CG regarding BBP issues
** Started Scenario 113
+
* Site response changes
** Updated wiki tables
+
** Surveyed current site response methods on BBP
* Investigated SDSU's validation run
+
** Make available to all methods
** BBToolbox and Amp.exe use 2 different set of velocities
 
** Not able to reproduce Rumi's graph, need to follow up with her
 
  
== Today: ==
+
== Today ==
  
* Fling Study
+
* Finish site response changes
** Continue to schedule Fling scenarios
+
** Maintain existing workflow
** Scenario 113 should finish soon, start 114 and 115.
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
** Verify John's scenario 108
+
* Update wiki page for multi-segment ruptures
* Follow-up with Rumi wrt her validation run results
+
** Add diagram
* Find a place in the BB src tree to put the plot files
+
* Review High-F package from SA
  
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
* SDSU's result validation with Rumi
 
  
== Ongoing: ==  
+
* No
* Make trunk work both with and without site response
+
 
* Look for ways to break up the GF directory layout, some ideas are:
+
== To Do: ==
** First candidate is removing the plot directory from the GF directory
+
 
** Create separate validation package
+
=== Short Term ===
** Separate events and codebases from each other
+
 
 +
==== Broadband Platform ====
 +
 
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 
 +
=== Medium Term ===
 +
 
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon