Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
 
(303 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
+
== Yesterday ==
  
* Trac #152: Fixed rupture slip plot
+
* Looked for obs data for NR event
* Ran all full validations using the updated GP trunk
+
** Forward station list table to CG
** Most already finished ok, waiting for a few more
+
* Mtg with CG regarding BBP issues
* Broadband development meeting with Phil
+
* Site response changes
 +
** Surveyed current site response methods on BBP
 +
** Make available to all methods
  
== Today: ==
+
== Today ==
  
* Check all validation results
+
* Finish site response changes
* Check in updated code
+
** Maintain existing workflow
* Look into LOMAP results from over the weekend (Fabio + Phil)
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Continue sketching BBP workflow (component by component with input and output files)
+
* Update wiki page for multi-segment ruptures
* Look into HPCC 50-realization LOMAP script
+
** Add diagram
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
+
* Review High-F package from SA
* Trac #128: Work on Cruise Control setup
 
  
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
 +
 
* No
 
* No
 +
 +
== To Do: ==
 +
 +
=== Short Term ===
 +
 +
==== Broadband Platform ====
 +
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 +
=== Medium Term ===
 +
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon