Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
 
(291 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
+
== Yesterday ==
  
* Call with CG to discuss validation experiment pipeline
+
* Looked for obs data for NR event
* Reverted to g77 for Rob's HF code (gfortran generates NaN in output)
+
** Forward station list table to CG
* Fix bug in workflow generator that caused only GP GOF module to run
+
* Mtg with CG regarding BBP issues
* Ran 4-station LOMAP test (GOOD)
+
* Site response changes
* Ran full LOMAP test (GOOD)
+
** Surveyed current site response methods on BBP
** SDSU MOGOF takes a long time to run
+
** Make available to all methods
** Produces lots of plots
 
  
== Today: ==
+
== Today ==
  
* RP II interview @ 11:30
+
* Finish site response changes
* Follow up e-mail with CG to clarify use of site response and HP/LP filters while generating GOF
+
** Maintain existing workflow
* Look into arias plots module
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Write script to run LOMAP full validation on HPCC
+
* Update wiki page for multi-segment ruptures
* Test batching scripts with trunk
+
** Add diagram
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
+
* Review High-F package from SA
** Test new package with trunk
 
  
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
* RP II interview @ 11:30am
 
* ExSIM call with Phil, Paul, and Karen @ 2:00pm
 
  
== Pending: ==
+
* No
* Integrate SDSU code v1.4 into Broadband (after receiving data files)
+
 
 +
== To Do: ==
 +
 
 +
=== Short Term ===
 +
 
 +
==== Broadband Platform ====
 +
 
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 
 +
=== Medium Term ===
 +
 
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon