== Yesterday: ==
+
== Yesterday ==
  
* Meeting with PM and CG to discuss products needed for Dec 11 meeting
+
* Looked for obs data for NR event
* Worked with FW to fix GMPE code
+
** Forward station list table to CG
* Modified scripts to generate 4 component GMPE RotI50 files
+
* Mtg with CG regarding BBP issues
* Generated station list for 30km and 50km
+
* Site response changes
* Found issue in BBToolbox that was generating a SEGFAULT on epicenter
+
** Surveyed current site response methods on BBP
** Arch dependent issue
+
** Make available to all methods
** Found "magic" number that works
 
* Received updated UCSB code from JC
 
* Ran NR and Whittier with SDSU pipeline on epicenter
 
  
== Today: ==
+
== Today ==
  
* Generate 30 and 50km SAs from all 4 GMPEs using FW's code
+
* Finish site response changes
* Modify BBP pipeline to process GMPE validations
+
** Maintain existing workflow
** Different from regular validation, only some data products are produced
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Respond to CA regarding bias plot code
+
* Update wiki page for multi-segment ruptures
* Update UCSB code with JC's latest version
+
** Add diagram
 +
* Review High-F package from SA
  
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
* Cybershake meeting @11am
+
 
* Broadband discussion with PM @ TBD
+
* No
 +
 
 +
== To Do: ==
 +
 
 +
=== Short Term ===
 +
 
 +
==== Broadband Platform ====
 +
 
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 
 +
=== Medium Term ===
 +
 
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon