Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
 
(164 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
+
== Yesterday ==
  
* Created combined bias plot code
+
* Looked for obs data for NR event
** Post-processes realizations and creates a combined bias plot
+
** Forward station list table to CG
** Showed results to CG, took suggestions
+
* Mtg with CG regarding BBP issues
** Code finished and checked into svn
+
* Site response changes
* CSM Method
+
** Surveyed current site response methods on BBP
** Generated results for all 5 california events for part A
+
** Make available to all methods
** Created combined plots, ranking file
 
** Sent results to JA
 
** Got code update from JA with fix to green's function generator bug
 
** Update BBP version, patch fixes GF code's bug
 
* Irikura method
 
** Got filter details from JB
 
** Worked on converting 1-component Irikura file to BBP seismograms
 
* Talked to JC
 
** Provided instructions on how to run on cluster
 
** Got JC set up on epicenter, ready to go
 
* Worked with KO and RS to fix SDSU method
 
** Got fixes for 2 bugs in the SDSU code
 
** Code still produces different low-frequency seismograms
 
* ExSIM method
 
** Received e-mail from KA regarding ExSIM's parameters
 
** Follow-up with KA and CG to clarify per-event issues
 
  
== Today: ==
+
== Today ==
  
* Finish Irikura code, run simulations on epicenter for part A and part B
+
* Finish site response changes
* Waiting for SDSU code update
+
** Maintain existing workflow
* Ran last GMPE scenario for CSM method, send results to JA
+
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
 +
* Update wiki page for multi-segment ruptures
 +
** Add diagram
 +
* Review High-F package from SA
  
 
== Blocked: ==
 
== Blocked: ==
 +
 
* No
 
* No
  
 
== Followups: ==
 
== Followups: ==
* SEISM call @ 11am
+
 
* EXSIM call with CG and KA @ 1pm
+
* No
 +
 
 +
== To Do: ==
 +
 
 +
=== Short Term ===
 +
 
 +
==== Broadband Platform ====
 +
 
 +
* BBP Code updates needed before git migration
 +
** Move to argparse
 +
** Simplify tests to use smaller files
 +
** Remove unused data files in tests directory
 +
 
 +
* NGA-West 2 validation on BBP - Total: 6 days
 +
** Contact CG, collect input scenarios: 1 day
 +
** Write test code: 1 day
 +
** Run tests: 2 days
 +
** Review results: 2 days
 +
 
 +
=== Medium Term ===
 +
 
 +
* Package GF generation code from RG into BBP Platform
 +
* New raytracing code for SDSU method
 +
* Update Anderson method
 +
* BBP Projects
 +
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon