Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
*Helped Bruce Shaw compile RSQSim on Blue Waters
 
*Helped Bruce Shaw compile RSQSim on Blue Waters
 
*IDed comparison runs between different CyberShake studies for USC,SBSM,PAS,WNGC,STNI
 
*IDed comparison runs between different CyberShake studies for USC,SBSM,PAS,WNGC,STNI
 +
*Dumped Study 2.2 to sqlite db
  
 
== Today ==
 
== Today ==
Line 11: Line 12:
 
*Calculate hypos for src 115, rup 6; find best match
 
*Calculate hypos for src 115, rup 6; find best match
 
*Look over SC16 edu doc
 
*Look over SC16 edu doc
 +
*Continue sqlite dumps
  
 
== Blocked ==
 
== Blocked ==

Revision as of 15:45, 12 October 2016

Yesterday

  • Queued up jobs to create all src 115, rup 6 realizations to better match variations between v3.3.1 and v5.2.3
  • Helped Bruce Shaw compile RSQSim on Blue Waters
  • IDed comparison runs between different CyberShake studies for USC,SBSM,PAS,WNGC,STNI
  • Dumped Study 2.2 to sqlite db

Today

  • Respond to Bruce
  • Install ERF 41 rupture geometry files
  • Decide if SGTs must be regenerated for ERF 41
  • Generate comparison curves for 5 sites for ABF paper
  • Calculate hypos for src 115, rup 6; find best match
  • Look over SC16 edu doc
  • Continue sqlite dumps

Blocked

  • No

Follow-ups

  • Phil?

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration