Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Responded to Bruce
+
*Compared seismograms for best-matching hypos, uploaded to wiki
*Installed ERF 41 rupture geometry files
+
*Continued sqlite loads
*Determined SGTs must be regenerated for ERF 41
+
*Emailed Dawei, he fixed issue with Titan SGT run, resubmitted
*Generated comparison curves for 5 sites for ABF paper, emailed to Tom and Feng
+
*Emailed Greg at NCSA
*Calculated hypos for src 115, rup 6
 
*Continued sqlite dumps
 
*Emailed SC16 registration
 
  
 
== Today ==
 
== Today ==
*Compare seismograms for best-matching hypos
 
 
*Edit SC16 edu doc
 
*Edit SC16 edu doc
*Continue sqlite dumps
+
*Continue sqlite loads
*Check on Titan test
 
  
 
== Blocked ==
 
== Blocked ==
Line 18: Line 13:
  
 
== Follow-ups ==
 
== Follow-ups ==
 +
*11a with Lorna and Nick
 +
*1p, CyberShake call
 
*Phil?
 
*Phil?
  

Revision as of 15:57, 14 October 2016

Yesterday

  • Compared seismograms for best-matching hypos, uploaded to wiki
  • Continued sqlite loads
  • Emailed Dawei, he fixed issue with Titan SGT run, resubmitted
  • Emailed Greg at NCSA

Today

  • Edit SC16 edu doc
  • Continue sqlite loads

Blocked

  • No

Follow-ups

  • 11a with Lorna and Nick
  • 1p, CyberShake call
  • Phil?

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration