Difference between revisions of "Staff Priorities - David"

From SCECpedia
Jump to navigationJump to search
(Replaced content with "== Followups == * No")
 
(14 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yesterday ==
+
== Followups ==  
 
 
* Finished scripts to plot 1D profiles for CyberShake region (land only, etc.)<br />
 
* Started looking into replicating EL plots<br />
 
 
 
== Today ==
 
 
 
* Sent plots to CG<br />
 
* Verify 1D profile for UCVM (SCEC 1D)<br />
 
* Replicate EL plots (faults)<br />
 
* Test UCVM elevation, depth capabilities<br />
 
* Check remaining models into GitHub<br />
 
* High-F call at 11am
 
 
 
== Blocked ==
 
  
 
* No
 
* No
 
== Followups ==
 
 
* High-F call
 

Latest revision as of 16:47, 26 May 2017

Followups

  • No