Difference between revisions of "Staff Priorities - David"

From SCECpedia
Jump to navigationJump to search
(Replaced content with "== Followups == * No")
 
(428 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yesterday ==
 
 
- ShakeOut day<br />
 
- Diagnosing bug with negative Vp<br />
 
&nbsp;&nbsp;&nbsp;&nbsp;- Contacted PC and EL<br />
 
&nbsp;&nbsp;&nbsp;&nbsp;- Both suggested correct, avg over multi km<br />
 
- Running basin_query<br />
 
&nbsp;&nbsp;&nbsp;&nbsp;- Takes forever<br />
 
&nbsp;&nbsp;&nbsp;&nbsp;- Began writing MPI/multi-core version<br />
 
- Generating plots for proposed final model write-up<br />
 
 
== Today ==
 
 
- Generate 2.2.1 and 2.2.2 e-trees for RT<br />
 
- Inquire (TJ?) about issue when Vs +, Vp -<br />
 
- Northridge 20th anniversary meeting<br />
 
- Python script to easily batch gen diff plots of suite plots<br />
 
 
== Blocked ==
 
 
- CVM-S4.26 2.2.3
 
 
 
== Followups ==  
 
== Followups ==  
  
- No
+
* No

Latest revision as of 16:47, 26 May 2017

Followups

  • No