|
|
| (409 intermediate revisions by the same user not shown) |
| Line 1: |
Line 1: |
| − | == Yesterday: == | + | == Project/Product Backlog == |
| − | * Draft CME Meeting Agenda sent out | + | * Prepare Data Management talk for GMSV |
| − | * Hercules/BBP Meeting
| + | * Schedule PE's |
| − | * Titan Telecon scheduled
| + | * |
| − | * Catalina Meeting Response - Andreas - Monday
| |
| − | * Checked with JS/AP/CT about Mantle Model
| |
| − | * Give DG Archimedies an Etree Papers | |
| − | * Tracking down Software at intensity email list | |
| | | | |
| − | == Today: == | + | == Related Entries == |
| − | * ERI Meeting | + | *[[CME Project]] |
| − | * Finalize Agenda
| + | *[[Staff]] |
| − | * High-F Call
| |
| − | * CyberShake Call
| |
| − | * Confirm Filesystem migration (Friday) w/ group
| |
| − | * Review NCEE Session Meeting
| |
| − | * Confirm PEER work plan completed w/ THJ
| |
| − | * SI2 Report (July 15th)
| |
| − | * NCEE presentation (July 22)
| |
| − | * Test seism email list
| |
| − | * Fix issues with Geo email list
| |
| − | | |
| − | == Blocked: ==
| |
| − | * No
| |
| − | | |
| − | == Followups: ==
| |
| − | * NCCS workflow call
| |
| − | * BBP Telecon
| |
| − | | |
| − | == Pending: ==
| |
| − | * PRAC Final Report (Nov 15)
| |
| − | * SResponse
| |
| − | * Post laptop storage table on wiki
| |
| − | * FW ABF into CME codebase
| |
| − | * Updated BBP and UCVM required docs to include "known problems" file | |