Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
 
(384 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
+
== Current Items ==
*Calculated probabilistic results for all 14 sites with NGA comparisons
+
*Modify CyberShake to work on RSQSim ruptures
*Posted probabilistic results to wiki, emailed to group
+
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
*Added 1 Hz cost to wiki
+
*CyberShake training
 +
*Update CyberShake study wiki pages to point to SQLite files
 +
*Create wiki page for CyberShake RSQSim, and upload sample seismograms
  
== Today ==
+
== Project Backlog ==
*Make SC travel plans
+
*Run CyberShake post-processing on RSQSim events, once DB is populated
*Perform deterministic calculation for 14 sites
+
*Produce candidate site list for Bay Area CyberShake
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
+
*Investigate improved load-balancing for DirectSynth SGT handlers
*Consult with Gideon about Titan next steps
+
*Experiment with OMP parallelization for post-processing
*Integrate RotD50/RotD100 calculation into workflow
 
 
 
== Blocked ==
 
*No
 
 
 
== Follow-ups ==
 
*No
 
 
 
== Areas of Responsibilities ==
 
* CyberShake
 
* Broadband CyberShake
 
* Code migration
 

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing