Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
 
(257 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
+
== Current Items ==
*Created basic C implementation of Nenad's duration measures
+
*Modify CyberShake to work on RSQSim ruptures
*Worked on NCSI document (integrated Ricardo's changes, looked over past exascale planning)
+
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
 +
*CyberShake training
 +
*Update CyberShake study wiki pages to point to SQLite files
 +
*Create wiki page for CyberShake RSQSim, and upload sample seismograms
  
== Today ==
+
== Project Backlog ==
*Continue work on NSCI document
+
*Run CyberShake post-processing on RSQSim events, once DB is populated
*Work with Fabio to determine best source of duration measures
+
*Produce candidate site list for Bay Area CyberShake
*Test version of broadband CyberShake workflow which has better load balancing
+
*Investigate improved load-balancing for DirectSynth SGT handlers
 
+
*Experiment with OMP parallelization for post-processing
== Blocked ==
 
*No
 
 
 
== Follow-ups ==
 
*Fabio
 
*HighF
 
 
 
== Areas of Responsibilities ==
 
* CyberShake
 
* Broadband CyberShake
 
* Code migration
 

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing