Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
 
(102 intermediate revisions by the same user not shown)
Line 1: Line 1:
−
== Yesterday ==
+
== Current Items ==
−
*Queued up jobs to create all src 115, rup 6 realizations to better match variations between v3.3.1 and v5.2.3
+
*Modify CyberShake to work on RSQSim ruptures
−
*Helped Bruce Shaw compile RSQSim on Blue Waters
+
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
−
*IDed comparison runs between different CyberShake studies for USC,SBSM,PAS,WNGC,STNI
+
*CyberShake training
−
*Dumped Study 2.2 to sqlite db
+
*Update CyberShake study wiki pages to point to SQLite files
 +
*Create wiki page for CyberShake RSQSim, and upload sample seismograms
  
−
== Today ==
+
== Project Backlog ==
−
*Respond to Bruce
+
*Run CyberShake post-processing on RSQSim events, once DB is populated
−
*Install ERF 41 rupture geometry files
+
*Produce candidate site list for Bay Area CyberShake
−
*Decide if SGTs must be regenerated for ERF 41
+
*Investigate improved load-balancing for DirectSynth SGT handlers
−
*Generate comparison curves for 5 sites for ABF paper
+
*Experiment with OMP parallelization for post-processing
−
*Calculate hypos for src 115, rup 6; find best match
 
−
*Look over SC16 edu doc
 
−
*Continue sqlite dumps
 
−
*Email SC16 registration
 
−
 
 
−
== Blocked ==
 
−
*No
 
−
 
 
−
== Follow-ups ==
 
−
*Phil?
 
−
 
 
−
== Areas of Responsibilities ==
 
−
* CyberShake
 
−
* Broadband CyberShake
 
−
* Code migration
 

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing