Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
 
(514 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
+
== Current Items ==
*Tested refactored DAX hierarchy, seems good
+
*Modify CyberShake to work on RSQSim ruptures
*Geoinformatics call
+
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
*Meeting with Phil
+
*CyberShake training
*Investigated possible race condition with workflow status
+
*Update CyberShake study wiki pages to point to SQLite files
 +
*Create wiki page for CyberShake RSQSim, and upload sample seismograms
  
== Today ==
+
== Project Backlog ==
*Queue test with new version of GPU code with no capping to compare to old CPU results
+
*Run CyberShake post-processing on RSQSim events, once DB is populated
*Queue test with new version of CPU code with modified I/O
+
*Produce candidate site list for Bay Area CyberShake
*If tests look good, resubmit verification curves
+
*Investigate improved load-balancing for DirectSynth SGT handlers
*Try 7x PP test on BW
+
*Experiment with OMP parallelization for post-processing
*Incorporate technical readiness review changes
 
*See if Yifeng is available for technical review Monday
 
 
 
*Mesh sizes
 
*Matching CPU/GPU curves
 
*Tag code in SVN, post versions on study page
 
*Call with BW
 
*Confirm storage
 
*Reservation request
 
 
 
== Blocked ==
 
*No
 
 
 
== Follow-ups ==
 
*No
 
 
 
== Areas of Responsibilities ==
 
* CyberShake
 
* Broadband CyberShake
 
* Code migration
 

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing