Difference between revisions of "CSEP Minutes 05-23-2018"
From SCECpedia
Jump to navigationJump to search(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[[CSEP_Working_Group|CSEP Working Group Home Page]]<br><br> | [[CSEP_Working_Group|CSEP Working Group Home Page]]<br><br> | ||
− | Participants: | + | Participants: A. Michael; J. Gilchrist; J. Yu; M. Werner; and W. Savran |
− | |||
− | |||
− | |||
− | A. Michael; J. Gilchrist; J. Yu; | ||
== Minutes == | == Minutes == | ||
− | |||
− | |||
− | |||
− | |||
'''CSEP/CISM/Paleoseismology Workshops''' | '''CSEP/CISM/Paleoseismology Workshops''' | ||
Line 21: | Line 13: | ||
** Switch to 1 day workshop | ** Switch to 1 day workshop | ||
** Proposal to split half time on Paleo side and physics-based forecasting side. | ** Proposal to split half time on Paleo side and physics-based forecasting side. | ||
+ | * CSEP overlap with the Earthquake gates group. | ||
'''Curation of CSEP1 data set''' | '''Curation of CSEP1 data set''' | ||
Line 26: | Line 19: | ||
* Step 1: Figure out the status of the CSEP system, and make decision based on resources. | * Step 1: Figure out the status of the CSEP system, and make decision based on resources. | ||
* Important to get 'complete' set of results and publish those. | * Important to get 'complete' set of results and publish those. | ||
+ | * Notes: CSEP does not use Comcat for authoritative data set | ||
+ | * Idea: run comparison to see how much the catalogs change and its effects on the forecasts | ||
** Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem. | ** Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem. | ||
** ''Proposal from Max:'' Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system. | ** ''Proposal from Max:'' Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system. | ||
− | * Task for Bill: Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required. | + | * ''Task for Bill:'' Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required. |
Latest revision as of 20:18, 23 May 2018
Participants: A. Michael; J. Gilchrist; J. Yu; M. Werner; and W. Savran
Minutes
CSEP/CISM/Paleoseismology Workshops
- CSEP Workshop funded, hoping for the SCEC annual meeting
- 1 day workshop (wrapping up CSEP1 and planning for CSEP2)
- Need to start thinking about what to address; extended abstracts, etc.
- Hope to present CSEP1 curated data set; hoping for California one-day model evaluations.
- W/r/t to the CISM/Paleoseismology
- Switch to 1 day workshop
- Proposal to split half time on Paleo side and physics-based forecasting side.
- CSEP overlap with the Earthquake gates group.
Curation of CSEP1 data set
- Goal: v1.0 of CSEP1 data set by mid-summer.
- Step 1: Figure out the status of the CSEP system, and make decision based on resources.
- Important to get 'complete' set of results and publish those.
- Notes: CSEP does not use Comcat for authoritative data set
- Idea: run comparison to see how much the catalogs change and its effects on the forecasts
- Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem.
- Proposal from Max: Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system.
- Task for Bill: Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required.