Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 17: Line 17:
 
** Verify John's scenario 108
 
** Verify John's scenario 108
 
* Follow-up with Rumi wrt her validation run results
 
* Follow-up with Rumi wrt her validation run results
 +
* Find a place in the BB src tree to put the plot files
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:07, 1 June 2012

Yesterday:

  • Fling Study
    • Finished running Scenario 104
    • Ran Scenario 107, compared results against John's run --> OK
    • Started Scenario 113
    • Updated wiki tables
  • Investigated SDSU's validation run
    • BBToolbox and Amp.exe use 2 different set of velocities
    • Not able to reproduce Rumi's graph, need to follow up with her

Today:

  • Fling Study
    • Continue to schedule Fling scenarios
    • Scenario 113 should finish soon, start 114 and 115.
    • Verify John's scenario 108
  • Follow-up with Rumi wrt her validation run results
  • Find a place in the BB src tree to put the plot files

Blocked:

  • No

Followups:

  • SDSU's result validation with Rumi

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other