* Fling Study | * Fling Study | ||
− | ** Monitoring Scenario 138 ( | + | ** Monitoring Scenario 138 (1 more day) |
− | ** John Yu ran Scenarios | + | ** John Yu ran Scenarios 112 (largest one) |
− | ** | + | ** Filesystem issue on intensity (not due to Fling Study data, but because of a disk failure) |
− | ** Validated | + | ** Validated several Fling scenarios (106, 110, 112, 129, 130, 135, and 136) |
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ||
− | * | + | * Participated in the GMSV call |
− | * | + | * Met Phil to discuss Broadband development |
== Today: == | == Today: == | ||
* Fling Study | * Fling Study | ||
− | ** Validate scenarios | + | ** Start scenario 139 (last one!) |
− | * | + | ** Validate any scenarios that finish today (138, others from John?) |
− | + | * Create/update Trak issues | |
− | * Meet with Phil | + | * Meet with Phil to continue discussion on BBP development |
− | |||
− | |||
− | |||
− | |||
== Blocked: == | == Blocked: == | ||
Line 26: | Line 22: | ||
== Followups: == | == Followups: == | ||
− | + | * Meeting with Phil after standup call | |
− | * Meeting with Phil | ||
== Ongoing: == | == Ongoing: == |
Revision as of 16:34, 12 June 2012
Contents
Yesterday:
- Fling Study
- Monitoring Scenario 138 (1 more day)
- John Yu ran Scenarios 112 (largest one)
- Filesystem issue on intensity (not due to Fling Study data, but because of a disk failure)
- Validated several Fling scenarios (106, 110, 112, 129, 130, 135, and 136)
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Participated in the GMSV call
- Met Phil to discuss Broadband development
Today:
- Fling Study
- Start scenario 139 (last one!)
- Validate any scenarios that finish today (138, others from John?)
- Create/update Trak issues
- Meet with Phil to continue discussion on BBP development
Blocked:
- No
Followups:
- Meeting with Phil after standup call
Ongoing:
- Make trunk work both with and without site response
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other