Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
* Fling Study
 
* Fling Study
** Scenario 137 validated
+
** Scenario 139 validated
** We are now 37/42
+
** We are now 38/42
** Remaining scenarios running on GEOSYS and HPCC
+
** Remaining scenarios all running on GEOSYS
 
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
 
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
* Talked to John Yu about setting up Cruise Control
+
* Talked to John Yu about Broadband resources, backups
* Worked on testing code on trunk, removed unused tests
+
* Worked on testing code on trunk, fixed few issues
 +
* Trunk passes Unit tests
 +
* Finishing running Acceptance tests (so far so good...)
  
 
== Today: ==
 
== Today: ==
Line 13: Line 15:
 
* Fling Study
 
* Fling Study
 
** Monitoring running scenarios
 
** Monitoring running scenarios
* Make trunk pass Unit tests (almost there)
 
 
* Make trunk pass Acceptance tests
 
* Make trunk pass Acceptance tests
* Create Cruise Control configuration file (use Kevin's template)
+
* Continue working on the testing framework
 +
* Start full validation comparison of trunk versus 11.2.3
 +
* Work on Cruise Control setup (pending John Yu install)
  
 
== Blocked: ==
 
== Blocked: ==
Line 21: Line 24:
  
 
== Followups: ==
 
== Followups: ==
* Broadband development with Phil @ TBD
+
* Cybershake call @ 11
  
 
== Ongoing: ==  
 
== Ongoing: ==  

Revision as of 15:55, 20 June 2012

Yesterday:

  • Fling Study
  • Talked to John Yu about Broadband resources, backups
  • Worked on testing code on trunk, fixed few issues
  • Trunk passes Unit tests
  • Finishing running Acceptance tests (so far so good...)

Today:

  • Fling Study
    • Monitoring running scenarios
  • Make trunk pass Acceptance tests
  • Continue working on the testing framework
  • Start full validation comparison of trunk versus 11.2.3
  • Work on Cruise Control setup (pending John Yu install)

Blocked:

  • No

Followups:

  • Cybershake call @ 11

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other