Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 8: Line 8:
 
* Trac #127: Survey BB Infrastructure: Closed.
 
* Trac #127: Survey BB Infrastructure: Closed.
 
* Trac #102/#126 (dup): Move Plots code: Closed.
 
* Trac #102/#126 (dup): Move Plots code: Closed.
* Trac #130: File paths on SDSU code: Closed.
+
* Trac #130: File path length on SDSU code: Closed.
 
* Running full validation tests for URS code (NR, LP completed, LA almost done)
 
* Running full validation tests for URS code (NR, LP completed, LA almost done)
 
** Compared LP full validation of trunk and 11.2.3 and results are identical
 
** Compared LP full validation of trunk and 11.2.3 and results are identical

Revision as of 16:55, 22 June 2012

Yesterday:

  • Fling Study
  • Trac #127: Survey BB Infrastructure: Closed.
  • Trac #102/#126 (dup): Move Plots code: Closed.
  • Trac #130: File path length on SDSU code: Closed.
  • Running full validation tests for URS code (NR, LP completed, LA almost done)
    • Compared LP full validation of trunk and 11.2.3 and results are identical
    • Running NR full validation on 11.2.3 (didn't save that output)
  • Built trunk on HPCC
    • PlotMap and PlotGOF didn't work with older matplotlib, created trac issues
  • Started work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass

Today:

  • Fling Study
    • Monitoring running scenarios
  • Compare URS full validations from trunk against 11.2.3 (LA and NR)
  • Continue working on HPCC parallel scripts to run Fling scenarios in half time
  • Continue working on the testing framework
  • Work on Cruise Control setup (pending John Yu install)

Blocked:

  • John Yu: Installing Cruise Control

Followups:

  • No

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other