Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Got Python distribution moved in HPCC to /home/scec-00/opt |
− | ** | + | * Trac #131: Improved parallel scripts at HPCC, need to run more tests and finish packaging |
− | * | + | ** Ran Fling scenario 101 with new scripts, results are ok |
− | ** | + | * Talked to Masha, got Cruise Control configuration files |
+ | ** Current Cruise Control installation on broadband.usc.edu needs a few extra packages, will ask John Yu | ||
+ | * Trac issue #82: Separate validation code from Greens Functions: done, testing | ||
+ | ** UCSB and URS codebases run without problems | ||
+ | ** Running SDSU's acceptance tests to make sure nothing was broken (nr and lp finished already) | ||
+ | * Trac #84: User selectable Greens Functions | ||
+ | ** Initial design and walk through the codebase | ||
* Trac issue #143: Fixed path length issues on URS pipeline | * Trac issue #143: Fixed path length issues on URS pipeline | ||
− | ** | + | ** Testing, running validations |
− | |||
* Trac issue #104: Environment variables select GF and validation directories: done, testing | * Trac issue #104: Environment variables select GF and validation directories: done, testing | ||
− | |||
== Today: == | == Today: == | ||
Line 15: | Line 19: | ||
* Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP | ||
* Trac #104: Write sample scripts | * Trac #104: Write sample scripts | ||
− | * Trac #82: | + | * Trac #82: Finish last acceptance test (SDSU-la) |
* Trac #84: User selectable Greens Functions | * Trac #84: User selectable Greens Functions | ||
* Continue sketching BBP workflow (component by component with input and output files) | * Continue sketching BBP workflow (component by component with input and output files) | ||
− | * Trac issue #128: | + | * Trac issue #128: Continue working on Cruise Control setup |
+ | ** Waiting for John to install missing JAR file(s) | ||
== Blocked: == | == Blocked: == | ||
Line 24: | Line 29: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Call with Phil @ 1:30pm |
− | + | * Broadband science call @ 2:00pm | |
− | |||
− | * | ||
− | |||
− | |||
− |
Revision as of 20:23, 13 July 2012
Contents
Yesterday:
- Got Python distribution moved in HPCC to /home/scec-00/opt
- Trac #131: Improved parallel scripts at HPCC, need to run more tests and finish packaging
- Ran Fling scenario 101 with new scripts, results are ok
- Talked to Masha, got Cruise Control configuration files
- Current Cruise Control installation on broadband.usc.edu needs a few extra packages, will ask John Yu
- Trac issue #82: Separate validation code from Greens Functions: done, testing
- UCSB and URS codebases run without problems
- Running SDSU's acceptance tests to make sure nothing was broken (nr and lp finished already)
- Trac #84: User selectable Greens Functions
- Initial design and walk through the codebase
- Trac issue #143: Fixed path length issues on URS pipeline
- Testing, running validations
- Trac issue #104: Environment variables select GF and validation directories: done, testing
Today:
- Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #104: Write sample scripts
- Trac #82: Finish last acceptance test (SDSU-la)
- Trac #84: User selectable Greens Functions
- Continue sketching BBP workflow (component by component with input and output files)
- Trac issue #128: Continue working on Cruise Control setup
- Waiting for John to install missing JAR file(s)
Blocked:
- No
Followups:
- Call with Phil @ 1:30pm
- Broadband science call @ 2:00pm