Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Trac #84: User selectable Greens Functions
+
* Trac #151: Removed hard-coded values from validation script
** Full validations for sdsu, ucsb, and urs ran ok
+
** Put validation parameters in text file just like GFs configuration data
** Also ran simulation scenario (from Fling study)
+
* Created validation package for Northridge
** User can specify velocity model by number or name
+
** Started testing all codebases
** All code checked in
+
* Broadband development meeting with Phil
** Created packages for 3 GFs, and validations
 
  
 
== Today: ==
 
== Today: ==
  
* Set up LOMAP's GFs and validation data
+
* Trac #151: Finish testing
* Remove hard-coded parameters for validation events
+
* Create validation packages for Landers and Loma Prieta
** Put validation parameters in text file just like GFs configuration data
+
* Create LOMAP GF and validation packages
 +
* Test run with new stations/src file
 +
* Prepare HPCC 50-realization run
 
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
 
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
 
* Continue sketching BBP workflow (component by component with input and output files)
 
* Continue sketching BBP workflow (component by component with input and output files)

Revision as of 17:01, 31 July 2012

Yesterday:

  • Trac #151: Removed hard-coded values from validation script
    • Put validation parameters in text file just like GFs configuration data
  • Created validation package for Northridge
    • Started testing all codebases
  • Broadband development meeting with Phil

Today:

  • Trac #151: Finish testing
  • Create validation packages for Landers and Loma Prieta
  • Create LOMAP GF and validation packages
  • Test run with new stations/src file
  • Prepare HPCC 50-realization run
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No

Followups:

  • No