Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
* Trac #151: Removed hard-coded values from validation Python script
 
* Trac #151: Removed hard-coded values from validation Python script
** Put validation parameters in text file just like GFs configuration data
+
** Finished testing, code is checked in
* Created validation package for Northridge
+
** Created validation event packages for Landers and Loma Prieta
** Started testing all codebases
+
** Started testing all codebases: UCSB finished and ok, others running
 +
* Created LOMAP GF package (only URS code, waiting for UCSB)
 
* Broadband development meeting with Phil
 
* Broadband development meeting with Phil
* Created new Trac issues
 
  
 
== Today: ==
 
== Today: ==
  
* Trac #151: Finish testing
+
* Trac #150: Include rupture generator in validation workflow
* Create validation packages for Landers and Loma Prieta
+
* Create validation packages
* Create LOMAP GF and validation packages
 
 
* LOMAP Test run with new stations/src file
 
* LOMAP Test run with new stations/src file
* Prepare HPCC 50-realization LOMAP run
+
* Prepare HPCC 50-realization LOMAP script
 
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
 
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
 
* Continue sketching BBP workflow (component by component with input and output files)
 
* Continue sketching BBP workflow (component by component with input and output files)
Line 23: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* Broadband 2-week plan with Phil @ TBD
+
* SCEC call @ 11am

Revision as of 17:00, 1 August 2012

Yesterday:

  • Trac #151: Removed hard-coded values from validation Python script
    • Finished testing, code is checked in
    • Created validation event packages for Landers and Loma Prieta
    • Started testing all codebases: UCSB finished and ok, others running
  • Created LOMAP GF package (only URS code, waiting for UCSB)
  • Broadband development meeting with Phil

Today:

  • Trac #150: Include rupture generator in validation workflow
  • Create validation packages
  • LOMAP Test run with new stations/src file
  • Prepare HPCC 50-realization LOMAP script
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No

Followups:

  • SCEC call @ 11am