Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * Trac # | + | * Trac #150: Included rupture generator in validation workflow |
− | + | * Created validation packages | |
− | + | * Ran LOMAP Test with new stations/src file | |
− | * | + | * Broadband science call |
− | * | + | * Broadband development mtg with Phil |
− | * Broadband development | + | * Renamed all URS references to GP in the Broadband code |
== Today: == | == Today: == | ||
− | * Trac # | + | * Trac #152: Rupture slip plot comes out distorted |
− | + | * Look into LOMAP results from over the weekend (Fabio + Phil) | |
− | * LOMAP | + | * Look into HPCC 50-realization LOMAP script |
− | * | ||
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac #131: Package new parallel running scripts and check them into svn as part of BBP | ||
* Continue sketching BBP workflow (component by component with input and output files) | * Continue sketching BBP workflow (component by component with input and output files) | ||
Line 22: | Line 21: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
Revision as of 16:59, 6 August 2012
Contents
Yesterday:
- Trac #150: Included rupture generator in validation workflow
- Created validation packages
- Ran LOMAP Test with new stations/src file
- Broadband science call
- Broadband development mtg with Phil
- Renamed all URS references to GP in the Broadband code
Today:
- Trac #152: Rupture slip plot comes out distorted
- Look into LOMAP results from over the weekend (Fabio + Phil)
- Look into HPCC 50-realization LOMAP script
- Trac #131: Package new parallel running scripts and check them into svn as part of BBP
- Continue sketching BBP workflow (component by component with input and output files)
- Trac #128: Work on Cruise Control setup
Blocked:
- No
Followups:
- No