Jump to navigationJump to searchLine 6: | Line 6: | ||
#Add observation data processing into validation pipeline | #Add observation data processing into validation pipeline | ||
#Configure UCSB and SDSU methods to run LOMAP | #Configure UCSB and SDSU methods to run LOMAP | ||
− | + | #Documentation: Installation and User Guide | |
+ | #Broadband 12.8.0 Release | ||
+ | ##Full validation tests | ||
+ | ##Produce validation and velocity model packages | ||
== Sprint 3 == | == Sprint 3 == |
Revision as of 22:33, 10 August 2012
Development targets, Trac Tickets, and other activities related to Broadband Platform development
Contents
Spring 4
- Spring Dates - 13 August - 24 August
- Add rotd50 into validation pipeline
- Add arias duration into validation pipeline
- Add observation data processing into validation pipeline
- Configure UCSB and SDSU methods to run LOMAP
- Documentation: Installation and User Guide
- Broadband 12.8.0 Release
- Full validation tests
- Produce validation and velocity model packages
Sprint 3
- Sprint Dates: 30 July - 10 August
- Routine plotting of LOMAP full validation with comparison acceleration plots (with fixed label), and Bias GOF plots for LOMA Prieta
- LOMAP workflow changed to include rupture generator
- Wiki site updated to contain current input files, current GOF, and example comparison plots
- URS modules renamed to GP
- Documentation on how to setup new GF and validation data
- DB code and PEER formatter included in trunk
- Rupture generator parameters separated into user selectable (), and modeler adjustable (DLEN, DWID, DT)
- ROTD50 running with acceptance test and producing file as part of LOMAP
- ARIAS running with acceptance test and producing file as part of LOMAP
- Integrate new bbtoolbox into platform
Sprint 2
- Sprint Dates: 16 July - 27 July
- Change validation processing so users specify a velocity model, which then determines the GF used in processing, removing "region" based GF selection in bbp v11.2.3.
Sprint 1
- Sprint Dates: 2 July - 13 July
- Separate Validation Data from BBP software distribution so observational data sets are not distributed as part of BBP software