Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 9: | Line 9: | ||
*Check on UCVM run, continue testing integrated DAX generator | *Check on UCVM run, continue testing integrated DAX generator | ||
*Try another PP run, 40x240, with separated zip jobs and continuing through memcached errors | *Try another PP run, 40x240, with separated zip jobs and continuing through memcached errors | ||
+ | *Check on test with emod3d-mpi v1.16.3 | ||
== Blocked == | == Blocked == | ||
− | * | + | *Waiting on Kim to get info on desired runs |
== Follow-ups == | == Follow-ups == |
Revision as of 17:05, 13 August 2012
Yesterday
- Submitted SCEC abstract
- Found UCVM 11.9 still built on Kraken, passed tests
- Got UCVM 12.2 working, somehow, resubmitted test job
- Modified jbsim3d to keep going with memcached errors
- Got PP runs plots from Gideon, looks like zip jobs are taking a long time, added option to separate zip jobs into independent job
Today
- Check on UCVM run, continue testing integrated DAX generator
- Try another PP run, 40x240, with separated zip jobs and continuing through memcached errors
- Check on test with emod3d-mpi v1.16.3
Blocked
- Waiting on Kim to get info on desired runs
Follow-ups
- No
- Runs for Rob and Kim
- Continue testing compiler optimizations
- Run some I/O tests to get reference values
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration