Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to search| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
| − | * | + | * Worked on implementing the correct_rotd50 module |
| − | * | + | * Compared fling results from new trunk to what we got in June --> Checks out fine. |
| − | |||
| − | |||
* Updated batching scripts for using the new trunk | * Updated batching scripts for using the new trunk | ||
| − | |||
== Today: == | == Today: == | ||
| + | * Finish correct_rotd50 module, write test case | ||
* Work on generating Arias duration plot | * Work on generating Arias duration plot | ||
* Check batching scripts into svn (Trac #131) | * Check batching scripts into svn (Trac #131) | ||
| + | * Follow-up with RG, RA, JC regarding needed parameters for LOMAP | ||
* Write script to run LOMAP full validation on HPCC | * Write script to run LOMAP full validation on HPCC | ||
| Line 18: | Line 17: | ||
== Followups: == | == Followups: == | ||
| − | * | + | * Broadband meeting with Phil @ TBD |
| + | * Broadband science call @ 2pm | ||
Revision as of 17:17, 31 August 2012
Contents
Yesterday:
- Worked on implementing the correct_rotd50 module
- Compared fling results from new trunk to what we got in June --> Checks out fine.
- Updated batching scripts for using the new trunk
Today:
- Finish correct_rotd50 module, write test case
- Work on generating Arias duration plot
- Check batching scripts into svn (Trac #131)
- Follow-up with RG, RA, JC regarding needed parameters for LOMAP
- Write script to run LOMAP full validation on HPCC
Blocked:
- No
Followups:
- Broadband meeting with Phil @ TBD
- Broadband science call @ 2pm