Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Finished correct_rotd50 module, tested ok |
− | * | + | * Changed workflow generator so that it works with and without the site correction |
− | * | + | * Ran full validations for LP,LA,NR using UCSB code |
+ | ** Fixed minor issues | ||
+ | * Checked batch utils into SVN | ||
+ | * Broadband science call | ||
+ | * Broadband meeting with Phil | ||
== Today: == | == Today: == | ||
− | * | + | * Create updated validation packages for all events |
+ | ** Add UCSB LOMAP files for test run | ||
+ | * Start SCEC meeting poster | ||
+ | * Look into new BBToolBox | ||
* Work on generating Arias duration plot | * Work on generating Arias duration plot | ||
− | |||
− | |||
* Write script to run LOMAP full validation on HPCC | * Write script to run LOMAP full validation on HPCC | ||
Line 17: | Line 22: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
− |
Revision as of 17:07, 4 September 2012
Contents
Yesterday:
- Finished correct_rotd50 module, tested ok
- Changed workflow generator so that it works with and without the site correction
- Ran full validations for LP,LA,NR using UCSB code
- Fixed minor issues
- Checked batch utils into SVN
- Broadband science call
- Broadband meeting with Phil
Today:
- Create updated validation packages for all events
- Add UCSB LOMAP files for test run
- Start SCEC meeting poster
- Look into new BBToolBox
- Work on generating Arias duration plot
- Write script to run LOMAP full validation on HPCC
Blocked:
- No
Followups:
- No