Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Ran GP and UCSB on Broadband and HPCC
+
* Split GP GOF module into 2 parts
** Results posted on wiki
+
** gen_plots --> generates PSa and RotD50 comparisons, seismogram overlays
* Broadband Planning meeting with PG&E and SCE
+
** gp_gof --> generates bias plots for both PSa and RotD50 data
* SCEC AM Poster from Ronnie
+
* e-mailed RG about changing the simulation run time
* Need to re-run a few large scenarios with different parameters
+
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
 +
* Broadband development discussion with Phil
  
 
== Today: ==
 
== Today: ==
  
 
* Finish implementation of Arias Duration
 
* Finish implementation of Arias Duration
* Split GP GOF module into 2
+
* Test gen_plots and new gp_gof, check code into svn
** Bias plot generation
+
* Respond to RG's e-mail
** Everything else
+
* Start BBToolbox integration
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:03, 18 September 2012

Yesterday:

  • Split GP GOF module into 2 parts
    • gen_plots --> generates PSa and RotD50 comparisons, seismogram overlays
    • gp_gof --> generates bias plots for both PSa and RotD50 data
  • e-mailed RG about changing the simulation run time
  • e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
  • Broadband development discussion with Phil

Today:

  • Finish implementation of Arias Duration
  • Test gen_plots and new gp_gof, check code into svn
  • Respond to RG's e-mail
  • Start BBToolbox integration

Blocked:

  • No

Followups:

  • No