Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 5: Line 5:
 
* Exchanged e-mails with RG about changing the simulation run time
 
* Exchanged e-mails with RG about changing the simulation run time
 
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
 
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
 +
* Talked to CG about new RotD50 implementation
  
 
== Today: ==
 
== Today: ==
Line 10: Line 11:
 
* Test Arias Duration implementation, check code into svn
 
* Test Arias Duration implementation, check code into svn
 
* Try running jbsim with different simulation windows
 
* Try running jbsim with different simulation windows
 +
* Integrate faster RotD50 code
 
* Call with RK, PM
 
* Call with RK, PM
 
* Work on BBToolbox integration
 
* Work on BBToolbox integration

Revision as of 17:18, 19 September 2012

Yesterday:

  • Tested the new gen_plots and gp_gof modules
  • Added arias duration plot to the gen_plots module
  • Exchanged e-mails with RG about changing the simulation run time
  • e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
  • Talked to CG about new RotD50 implementation

Today:

  • Test Arias Duration implementation, check code into svn
  • Try running jbsim with different simulation windows
  • Integrate faster RotD50 code
  • Call with RK, PM
  • Work on BBToolbox integration

Blocked:

  • No

Followups:

  • Cybershake call @ 11am
  • RK, PM call @ 1:30pm