Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 5: | Line 5: | ||
* Exchanged e-mails with RG about changing the simulation run time | * Exchanged e-mails with RG about changing the simulation run time | ||
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios | * e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios | ||
+ | * Talked to CG about new RotD50 implementation | ||
== Today: == | == Today: == | ||
Line 10: | Line 11: | ||
* Test Arias Duration implementation, check code into svn | * Test Arias Duration implementation, check code into svn | ||
* Try running jbsim with different simulation windows | * Try running jbsim with different simulation windows | ||
+ | * Integrate faster RotD50 code | ||
* Call with RK, PM | * Call with RK, PM | ||
* Work on BBToolbox integration | * Work on BBToolbox integration |
Revision as of 17:18, 19 September 2012
Contents
Yesterday:
- Tested the new gen_plots and gp_gof modules
- Added arias duration plot to the gen_plots module
- Exchanged e-mails with RG about changing the simulation run time
- e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
- Talked to CG about new RotD50 implementation
Today:
- Test Arias Duration implementation, check code into svn
- Try running jbsim with different simulation windows
- Integrate faster RotD50 code
- Call with RK, PM
- Work on BBToolbox integration
Blocked:
- No
Followups:
- Cybershake call @ 11am
- RK, PM call @ 1:30pm