Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 9: Line 9:
 
* Edit CME section of RFP
 
* Edit CME section of RFP
 
* Distribute exsim configuration file to christine
 
* Distribute exsim configuration file to christine
 +
* Sprint review and spring planning with FS
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:35, 24 September 2012

Yesterday:

  • Scheduled High-F call for 4 Oct
  • Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
  • Reposted event file with updated Qp

Today:

  • Meeting with JY on hypocenter posting, accts, and julL acct 11am
  • Telecon with JC on ucsb method at 2pm
  • Edit CME section of RFP
  • Distribute exsim configuration file to christine
  • Sprint review and spring planning with FS

Blocked:

  • No

Followups:

Pending: