Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Scheduled High-F call for 4 Oct
+
* Met with JY on hypocenter posting, accts, and julL acct 11am
* Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
+
* Talked with JC on ucsb method at 2pm
* Reposted event file with updated Qp
+
* Wrote and distributed CME allocation text for RFP
* Responded to NCAR about Yellowstone early access
+
* Sprint review and spring planning with FS 1030am
 +
* Sent building response Viz to MK
 +
* Migrated JL from gtl to intensity
  
 
== Today: ==
 
== Today: ==
* Meeting with JY on hypocenter posting, accts, and julL acct 11am
+
*  
* Telecon with JC on ucsb method at 2pm
+
* Update links on broadband wiki to backed-up location
* Edit CME section of RFP
+
* Complete sprint plan update on wiki
* Distribute exsim configuration file to christine
 
* Sprint review and spring planning with FS 1030am
 
 
* INCITE Quarterly report due Friday
 
* INCITE Quarterly report due Friday
 
* PRAC Annual report due Friday
 
* PRAC Annual report due Friday
 
* Papers to LS
 
* Papers to LS
* Viz to MK
+
* BBP data products summary
* SAM Follow-ups
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:41, 25 September 2012

Yesterday:

  • Met with JY on hypocenter posting, accts, and julL acct 11am
  • Talked with JC on ucsb method at 2pm
  • Wrote and distributed CME allocation text for RFP
  • Sprint review and spring planning with FS 1030am
  • Sent building response Viz to MK
  • Migrated JL from gtl to intensity

Today:

  • Update links on broadband wiki to backed-up location
  • Complete sprint plan update on wiki
  • INCITE Quarterly report due Friday
  • PRAC Annual report due Friday
  • Papers to LS
  • BBP data products summary

Blocked:

  • No

Followups:

  • No

Pending:

  • No