Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 3: | Line 3: | ||
* Continued working on BBToolbox integration | * Continued working on BBToolbox integration | ||
** Different ways to handle scenario and validation simulations | ** Different ways to handle scenario and validation simulations | ||
− | * | + | * Ran 50-realization UCSB on HPCC |
− | ** | + | ** Results available |
− | ** | + | * Worked with JY to change Python path on HPCC |
− | * | + | ** Folks should use /home/scec-00/opt/python/default |
− | |||
− | |||
− | |||
− | |||
== Today: == | == Today: == | ||
* Continue integrating BBToolbox into BBP | * Continue integrating BBToolbox into BBP | ||
+ | ** Try to run LOMAP with BBToolbox | ||
+ | ** Send status update to Kim, Rumi | ||
* Run 50-realization UCSB on HPCC | * Run 50-realization UCSB on HPCC | ||
Line 21: | Line 19: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Cybershake review 11am-1pm |
Revision as of 16:59, 3 October 2012
Contents
Yesterday:
- Continued working on BBToolbox integration
- Different ways to handle scenario and validation simulations
- Ran 50-realization UCSB on HPCC
- Results available
- Worked with JY to change Python path on HPCC
- Folks should use /home/scec-00/opt/python/default
Today:
- Continue integrating BBToolbox into BBP
- Try to run LOMAP with BBToolbox
- Send status update to Kim, Rumi
- Run 50-realization UCSB on HPCC
Blocked:
- No
Followups:
- Cybershake review 11am-1pm