Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Worked on ExtractSGT
+
*Sent Tom information on SCEC workflows
 +
*Worked on ExtractSGT - discovered issue, reworking
 +
*Tried to design database test with simultaneous reads on shock and surface
  
 
== Today ==
 
== Today ==
*Finish up work on ExtractSGT
+
*Continue working on ExtractSGT - expecting code from Efecan
*Get Tom information on SCEC workflows
+
*Running DB tests on focal and shock, send results to John when complete
*Construct database test with simultaneous reads on shock and surface
 
  
 
== Blocked ==
 
== Blocked ==
Line 11: Line 12:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*CyberShake calls
  
  

Revision as of 18:02, 28 November 2012

Yesterday

  • Sent Tom information on SCEC workflows
  • Worked on ExtractSGT - discovered issue, reworking
  • Tried to design database test with simultaneous reads on shock and surface

Today

  • Continue working on ExtractSGT - expecting code from Efecan
  • Running DB tests on focal and shock, send results to John when complete

Blocked

  • No

Follow-ups

  • CyberShake calls


  • Run test of I/O forwarding on Kraken
  • Continue testing compiler optimizations
  • Run some I/O tests to get reference values


Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration