Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Improved SRC file parsing in station list generator |
− | ** | + | ** Sent code back to FW for comments |
− | * | + | * Updated 50-realization scripts to add hypocenter randomization |
− | ** | + | ** Ran 6.0 GMPE scenario with new script, got randomized hypocenters |
− | * | + | * Worked with JY to get broadband installation script tested |
− | * | + | ** JB's installation is completed and he is ready to go |
− | * | + | ** E-mailed JB to let him know he is good to go |
− | |||
− | ** | ||
== Today: == | == Today: == | ||
− | * | + | * Package GMPE code into BBP after comments from FW |
− | + | * Get Rob's feedback on 50-realization GMPE scenario | |
− | ** | + | * Merge RK's matlab scripts into the platform and generate box plots for GMPE scenarios |
* Reply to KO about srf file parameters | * Reply to KO about srf file parameters | ||
− | |||
== Blocked: == | == Blocked: == | ||
Line 23: | Line 20: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
Revision as of 18:51, 15 January 2013
Contents
Yesterday:
- Improved SRC file parsing in station list generator
- Sent code back to FW for comments
- Updated 50-realization scripts to add hypocenter randomization
- Ran 6.0 GMPE scenario with new script, got randomized hypocenters
- Worked with JY to get broadband installation script tested
- JB's installation is completed and he is ready to go
- E-mailed JB to let him know he is good to go
Today:
- Package GMPE code into BBP after comments from FW
- Get Rob's feedback on 50-realization GMPE scenario
- Merge RK's matlab scripts into the platform and generate box plots for GMPE scenarios
- Reply to KO about srf file parameters
Blocked:
- No
Followups:
- No