Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Finished integrating RK's matlab scripts into the platform |
− | + | ** Generated BoxPlots for old December scenarios, compared to RK's | |
− | * | + | * Talked to KO about SRF file parameters |
− | * | + | ** New version of BBToolbox coming soon |
− | ** | + | * Generated Broadband SRC files from PS's Excel spreadsheet |
− | * | + | * Generated station lists for all GMPE scenarios |
− | * | + | ** Presented to CG and at BB call |
− | ** | + | ** Use 20km and 50km instead of 30/50km. |
− | ** | ||
== Today: == | == Today: == | ||
* Package GMPE code into BBP after comments from FW | * Package GMPE code into BBP after comments from FW | ||
− | * Generate | + | * Generate 12 GMPE validation packages |
− | * | + | * Start running GMPE simulations on the epicenter cluster |
− | * | + | * Add version numbers on validation packages and GFs |
− | * | + | * Incorporate JC's changes to the UCSB rupture generator |
+ | ** Use only 1 rupture generator for vertical and dipping faults | ||
+ | * Set up meeting with CG and KA to discuss ExSim implementation | ||
== Blocked: == | == Blocked: == |
Revision as of 23:05, 18 January 2013
Contents
Yesterday:
- Finished integrating RK's matlab scripts into the platform
- Generated BoxPlots for old December scenarios, compared to RK's
- Talked to KO about SRF file parameters
- New version of BBToolbox coming soon
- Generated Broadband SRC files from PS's Excel spreadsheet
- Generated station lists for all GMPE scenarios
- Presented to CG and at BB call
- Use 20km and 50km instead of 30/50km.
Today:
- Package GMPE code into BBP after comments from FW
- Generate 12 GMPE validation packages
- Start running GMPE simulations on the epicenter cluster
- Add version numbers on validation packages and GFs
- Incorporate JC's changes to the UCSB rupture generator
- Use only 1 rupture generator for vertical and dipping faults
- Set up meeting with CG and KA to discuss ExSim implementation
Blocked:
- No
Followups:
- No