Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
* Worked on ExSim integration | * Worked on ExSim integration | ||
− | ** | + | ** Got reply from KA about parameters, made few adjustments |
− | ** | + | ** Write complete ExSim parameter file |
− | ** | + | ** Invokes ExSim |
− | * | + | ** Looks at results |
− | * | + | ** Modified ExSim's frequencies to match the 63 periods expected in the platform |
== Today: == | == Today: == | ||
* Continue ExSim integration | * Continue ExSim integration | ||
− | ** | + | ** Reformat output files into RotD50 files |
** Create XML file to run ExSim within the Platform | ** Create XML file to run ExSim within the Platform | ||
− | |||
* Check into svn GMPE code | * Check into svn GMPE code | ||
+ | * Create North Palm Springs Validation package | ||
== Blocked: == | == Blocked: == | ||
Line 20: | Line 20: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Cybershake call @ 11am |
Revision as of 17:57, 6 February 2013
Contents
Yesterday:
- Worked on ExSim integration
- Got reply from KA about parameters, made few adjustments
- Write complete ExSim parameter file
- Invokes ExSim
- Looks at results
- Modified ExSim's frequencies to match the 63 periods expected in the platform
Today:
- Continue ExSim integration
- Reformat output files into RotD50 files
- Create XML file to run ExSim within the Platform
- Check into svn GMPE code
- Create North Palm Springs Validation package
Blocked:
- No
Followups:
- Cybershake call @ 11am