Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 7: Line 7:
 
** Looks at results
 
** Looks at results
 
** Modified ExSim's frequencies to match the 63 periods expected in the platform
 
** Modified ExSim's frequencies to match the 63 periods expected in the platform
 +
* Helped JB get corrected observation files for Northridge event
  
 
== Today: ==
 
== Today: ==

Revision as of 17:58, 6 February 2013

Yesterday:

  • Worked on ExSim integration
    • Got reply from KA about parameters, made few adjustments
    • Write complete ExSim parameter file
    • Invokes ExSim
    • Looks at results
    • Modified ExSim's frequencies to match the 63 periods expected in the platform
  • Helped JB get corrected observation files for Northridge event

Today:

  • Continue ExSim integration
    • Reformat output files into RotD50 files
    • Create XML file to run ExSim within the Platform
  • Check into svn GMPE code
  • Create North Palm Springs Validation package

Blocked:

  • No

Followups:

  • Cybershake call @ 11am